Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2026 | Partial Pass | 2/20/26 Forms set at entrance of door of building at SW corner extending to edge of building corner are correct. Okay to pour this sidewalk. Use expansion joint material at cold joints and at 40' minimum intervals. |
||
| 04/03/2026 | Partial Pass | Okay to pour vertical curb on north end of building, and Curb & gutter on north end of parking lot. Okay to pour landing and sidewalk at northwest corner. Ensure that all slopes are per plan | ||
| 05/05/2026 | Partial Pass | ok to pour the sidewalk on the southeast of the courtyard | ||
| 05/20/2026 | Partial Pass | The bike racks on the south east side of the courtyard is good and the sidewalk on the north west side is good | ||
| 07/29/2026 | Partial Pass | 7/29/26 Pedestrian crosswalk at North refuse enclosure is over 5% running slope. All sidewalk and curb ramps on site have been checked and comply except the compacted decomposed granite trail and the top of the Y shaped concrete sidewalk on west side of building. |