Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Apply Date:
08/15/2025
Applicant:
Andres Herrera
Description:
Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies

Permit Reviews

Permit Number - TD-DEV-0825-00212
Permit Status: Inspections
Permit Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Start Date Submittal Complete Date Status  
05/18/2026 DEVELOPMENT PACKAGE NEW REVISION v.3 05/18/2026 APPROVED Review Details
10/07/2025 DEVELOPMENT PACKAGE NEW v.2 10/30/2025 APPROVED Review Details
03/24/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 04/28/2026 REQUIRES RESUBMIT Review Details
08/18/2025 DEVELOPMENT PACKAGE NEW v.1 09/29/2025 REQUIRES RESUBMIT Review Details
05/06/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 05/08/2026 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0825-00212
Permite Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/22/2026 ENGR - Drainage Structures N/A Partial Pass PAG 307 double type 1 Catch Basin. -looked at yesterday Forms reinforcing and spacing correct. Set to survey stakes okay to Pour. Patch snap ties holes
10/21/2026 N/A Partial Pass 10/21/26
Northside drain pipe were 2 24” HTPE connect to 1 24”. Also 12” HDPE comes in at 45% from SE at type 1 catch basin per PAP 307. Reinforcing for floor and wall, correct OK to pour this catch basin, pending pictures showing forms 100 % complete and correct. -Keynote 16 -18" Nyloplast Basin drain pipe also correct with 12" hd HDPE and keynote 10 correct. Okay to backfill this stretch of 12" drain pipe connecting to same catch basin.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0825-00212
Permit Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/14/2026 PDSD Engineering Division Pre-Construction SITE Passed BMP's are in place, SWPPP board is in place, SWPPP book in office w/ NOI.
Survey in place, Pads certified. Rough grading is being done almost complete.. Strormdrain stakes are in place.
Inspections needed:
Grading inspections
Paving inspections
Flat work, sidewalk inspections
Drain drainage, structure inspections
Landscaping, appearance and function final
Striping and signage inspections
Engineering final

Scheduled Inspections

Scheduled Inspections - TD-DEV-0825-00212
Status: Inspections
Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Scheduled Date Description Entered By Entered Date
08/23/2026 SITE - Stormwater Follow-up Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
1_SWPPP - JTED BRIDGES PHASE III - SWPPP - 2026-01-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
TD-DEV-0825-00212 2ND COMMENT LETTER 3.29.26.PDF DOCUMENTS VIEW
APPROVED - 1_PLAN SET - JTED BRIDGES WOOD SHOP - 5679_DP_2025_08_15_V1 - STAMPED 10.30.2025.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
1_PLAN SET - JTED BRIDGES WOOD SHOP - 5679_DP_2025_08_15_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER (1).PDF DOCUMENTS VIEW
TD-DEV-0825-00212 COMMENT LETTER 9.12.25.PDF DOCUMENTS VIEW