Permit Details

Status:
Inspections
Type:
Development Package
Apply Date:
08/15/2025
Applicant:
Andres Herrera
Description:
Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies

Permit Reviews

Permit Number - TD-DEV-0825-00212
Permit Status: Inspections
Permit Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Start Date Submittal Complete Date Status  
05/18/2026 DEVELOPMENT PACKAGE NEW REVISION v.3 05/18/2026 APPROVED Review Details
10/07/2025 DEVELOPMENT PACKAGE NEW v.2 10/30/2025 APPROVED Review Details
03/24/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 04/28/2026 REQUIRES RESUBMIT Review Details
08/18/2025 DEVELOPMENT PACKAGE NEW v.1 09/29/2025 REQUIRES RESUBMIT Review Details
05/06/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 05/08/2026 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0825-00212
Permite Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/31/2026 ENGR - Drainage Structures N/A Partial Pass 326 lf of double 24" HDPE storm drain pipe at NW of project: pipe, bedding, elevations, and slope are good. Okay to backfill this section.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0825-00212
Permit Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/14/2026 PDSD Engineering Division Pre-Construction SITE Passed BMP's are in place, SWPPP board is in place, SWPPP book in office w/ NOI.
Survey in place, Pads certified. Rough grading is being done almost complete.. Strormdrain stakes are in place.
Inspections needed:
Grading inspections
Paving inspections
Flat work, sidewalk inspections
Drain drainage, structure inspections
Landscaping, appearance and function final
Striping and signage inspections
Engineering final

Scheduled Inspections

Scheduled Inspections - TD-DEV-0825-00212
Status: Inspections
Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Scheduled Date Description Entered By Entered Date
08/23/2026 SITE - Stormwater Follow-up Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .