Permit: TD-DEV-0825-00212
Permit Details
Status:
Inspections
Type:
Development Package
Address:
751 E TUCSON MARKETPLACE BL
Address NEW:
751 E TUCSON MARKETPLACE BL
Apply Date:
08/15/2025
Applicant:
Andres Herrera
Description:
Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Permit Reviews
Permit Number - TD-DEV-0825-00212
Permit Status: Inspections
Permit Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/18/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 05/18/2026 | APPROVED |
| 10/07/2025 | DEVELOPMENT PACKAGE NEW v.2 | 10/30/2025 | APPROVED |
| 03/24/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 04/28/2026 | REQUIRES RESUBMIT |
| 08/18/2025 | DEVELOPMENT PACKAGE NEW v.1 | 09/29/2025 | REQUIRES RESUBMIT |
| 05/06/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 05/08/2026 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0825-00212
Permite Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| SITE - Stormwater Follow-up | N/A | Scheduled |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0825-00212
Permit Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | BMP's are in place, SWPPP board is in place, SWPPP book in office w/ NOI. Survey in place, Pads certified. Rough grading is being done almost complete.. Strormdrain stakes are in place. Inspections needed: Grading inspections Paving inspections Flat work, sidewalk inspections Drain drainage, structure inspections Landscaping, appearance and function final Striping and signage inspections Engineering final |
Scheduled Inspections
Scheduled Inspections - TD-DEV-0825-00212
Status: Inspections
Description: Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 07/28/2026 | SITE - Stormwater Follow-up | Scheduled |