Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 07/31/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
326 lf of double 24" HDPE storm drain pipe at NW of project: pipe, bedding, elevations, and slope are good. Okay to backfill this section. |
| 10/22/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
PAG 307 double type 1 Catch Basin. -looked at yesterday Forms reinforcing and spacing correct. Set to survey stakes okay to Pour. Patch snap ties holes |