Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2026 | ENGR - Drainage Structures | Partial Pass | 326 lf of double 24" HDPE storm drain pipe at NW of project: pipe, bedding, elevations, and slope are good. Okay to backfill this section. |