Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2026 | Partial Pass | At north end of site 300 LF of single 24” HDPE and additional run of 100 2 24” in parallel. bedded correctly. HDPE okay to backfill and compact in lifts as necessary. schedule inspections for drainage structures as necessary along these runs. | ||
| 10/16/2026 | Partial Pass | Okay to backfill last of 24” Storm drain on North boundary. | ||
| 10/21/2026 | Partial Pass | 10/21/26 Northside drain pipe were 2 24” HTPE connect to 1 24”. Also 12” HDPE comes in at 45% from SE at type 1 catch basin per PAP 307. Reinforcing for floor and wall, correct OK to pour this catch basin, pending pictures showing forms 100 % complete and correct. -Keynote 16 -18" Nyloplast Basin drain pipe also correct with 12" hd HDPE and keynote 10 correct. Okay to backfill this stretch of 12" drain pipe connecting to same catch basin. |
||
| 10/30/2026 | Partial Pass | Keynote 15 Rim and invert correct. Engineer has clarified that it will be changed to PAG SD 307 type 1. Reinforcing is correct forms and I beam and frames correct. Okay to pour. Also manhole, keynote 14 manhole base is correct to PAG 300. Okay to pour |