Permit: TD-DEV-0526-00121
Permit Details
Status:
Inspections
Type:
Development Package
Address:
4004 S PARK AV BLDG 2
Address NEW:
4004 S PARK AV BLDG 2
Apply Date:
05/05/2026
Applicant:
Cary Broschat
Description:
Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot
Permit Reviews
Permit Number - TD-DEV-0526-00121
Permit Status: Inspections
Permit Description: Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2026 | DEVELOPMENT PACKAGE NEW v.2 | 08/17/2026 | APPROVED |
| 05/08/2026 | DEVELOPMENT PACKAGE NEW v.1 | 06/11/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TD-DEV-0526-00121
Permit Status: Inspections
Permit Description: Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot
| Date | Description | Comments |
|---|---|---|
| 08/17/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/17/2026 | Pre-Issuance - Required Documents - Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's) |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0526-00121
Permit Description: Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | NOI, SWPPP board and fencing will be checked at Storm water initial. Schedule Storm Water Initial Inspection as soon as you are ready. Inspections needed: -Stormwater initial, -Paving (to check AB before paving) -Sidewalk Flatwork -Engineering Final. -Site Consultation, if needed. |
|
| 09/29/2026 | SITE - Stormwater Setup and Controls | Passed | BMP's in place. Add gravel or sandbags on top of wattle to keep it in place. SWPPP board is good, but because of the rain he needs to weatherproof it, but it will be in place tomorrow NOI/CGP is good. Contractor tried using filter fabric underneath the catch basin grates, but they burst through. He is going to install a specific catch basin drain guard in its place. |