Permit Details

Status:
Inspections
Type:
Development Package
Address NEW:
4004 S PARK AV BLDG 2
Apply Date:
05/05/2026
Applicant:
Cary Broschat
Description:
Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot

Permit Reviews

Permit Number - TD-DEV-0526-00121
Permit Status: Inspections
Permit Description: Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot
Start Date Submittal Complete Date Status  
07/17/2026 DEVELOPMENT PACKAGE NEW v.2 08/17/2026 APPROVED Review Details
05/08/2026 DEVELOPMENT PACKAGE NEW v.1 06/11/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TD-DEV-0526-00121
Permit Status: Inspections
Permit Description: Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot
Date Description Comments
08/17/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/17/2026 Pre-Issuance - Required Documents - Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's)

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0526-00121
Permit Description: Restricted Records- Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/14/2026 PDSD Engineering Division Pre-Construction SITE Passed NOI, SWPPP board and fencing will be checked at Storm water initial. Schedule Storm Water Initial Inspection as soon as you are ready.
Inspections needed:
-Stormwater initial,
-Paving (to check AB before paving)
-Sidewalk Flatwork
-Engineering Final.
-Site Consultation, if needed.
09/29/2026 SITE - Stormwater Setup and Controls Passed BMP's in place. Add gravel or sandbags on top of wattle to keep it in place.
SWPPP board is good, but because of the rain he needs to weatherproof it, but it will be in place tomorrow NOI/CGP is good. Contractor tried using filter fabric underneath the catch basin grates, but they burst through. He is going to install a specific catch basin drain guard in its place.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
DESIGN PLAN-COT - TOPSC 2_DEVELOPMENT PACKAGE_260717_V2.PDF DOCUMENTS VIEW
TD-DEV-0526-00121 - 2ND COMMENT LETTER 8.12.26.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW