Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: SITE - Stormwater Setup and Controls

Date Description Inspector Results Comments
09/29/2026 SITE - Stormwater Setup and Controls Passed BMP's in place. Add gravel or sandbags on top of wattle to keep it in place.
SWPPP board is good, but because of the rain he needs to weatherproof it, but it will be in place tomorrow NOI/CGP is good. Contractor tried using filter fabric underneath the catch basin grates, but they burst through. He is going to install a specific catch basin drain guard in its place.