Permit Review Detail
Review Status: In Review
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-0526-00121
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | External Reviewers - Arizona Department of Transportation (ADOT) Standard | PENDING ASSIGNMENT | |||
| N/A | External Reviewers - COT Environmental Services Standard | PENDING ASSIGNMENT | |||
| N/A | External Reviewers - Tucson Airport Authority Standard | PENDING ASSIGNMENT | |||
| N/A | External Reviewers - Tucson Electric Power (TEP) Standard | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | NPPO Standard | PENDING ASSIGNMENT | |||
| N/A | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| N/A | Site Landscape Standard | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 05/18/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TD-DEV-0526-00121 (1st Review) Project: Installation of 816.64kW-DC / 520kW-AC solar photovoltaic canopies & EV chargers in parking lot Location: 4004 S PARK AV Unit: BLDG 2 Review Date: 5/18/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering *This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. * City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Review Comments: 1. Provide the development package case number, TD-DEV-0526-00121, adjacent to the title block on all sheets 2. Revise the sheet index to reflect all development package pages/sheets. a. This should be done for the bottom corner sheet xx of xx. This would mean the total page count should be XX of 8 based on what the current DP file shows b. Reformatting/reorganization of files and sheets in recommended. Regarding the scope of the solar canopy installation, include sheet DP-1.0, 2.0, & 3.0 into the main development package file set and included within the index and sheet tracking. 3. Provide an overall site plan/sheet to show exactly where the work proposed is occurring. As currently presented, it may be unclear/misinterpreted. 4. Provide an earthwork table on the grading and drainage sheet to show associated cut/fill quantities associated with the development. 5. For all curb openings proposed – include the width of the opening with each individual call out – if all curb openings are to be the same, the width can simply be included in the keynote #20. 6. Provide a surfacing construction detail to demonstrate compliance with UDC 7.4.6.I regarding surfacing requirements. 7. Provide a construction detail regarding keynote #18 – proposed wheel stops 8. Wheel stops will be required at all parking spaces adjacent to the Access Travel Lane towards the West of the parking lot area that goes North to South. This is required to ensure that vehicles are not allowed to overhang into said travel lanes. UDC 7.4.6.H If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov |
||
| 05/08/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 05/13/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added Parks, Environmental Services, TAA, ADOT, TEP, PAG, USPS, and SWG to the workflow. Review request email sent to Parks, TAA, ADOT, and TEP. FYI email sent to PAG, USPS, SWG. | ||
| 05/19/2026 | External Reviewers - COT Parks & Recreation Standard | REVIEW COMPLETED | CDRC, Approved Regarding TD-DEV-0526-00121, The City of Tucson Parks and Recreation Department has no additional requirements for the Project and no further reviews by TPRD are required. Parcel: 13216600A Regards, Joe Barr Project Manager Tucson Parks and Recreation 520-307-2811 |
||
| 05/13/2026 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 05/13/2026 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 05/13/2026 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 05/08/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | CDRC note: Ensure to include Fire and Environmental Services to the review cycle | ||
| 05/12/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED |