Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
09/14/2026 PDSD Engineering Division Pre-Construction SITE Passed NOI, SWPPP board and fencing will be checked at Storm water initial. Schedule Storm Water Initial Inspection as soon as you are ready.
Inspections needed:
-Stormwater initial,
-Paving (to check AB before paving)
-Sidewalk Flatwork
-Engineering Final.
-Site Consultation, if needed.