Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | NOI, SWPPP board and fencing will be checked at Storm water initial. Schedule Storm Water Initial Inspection as soon as you are ready. Inspections needed: -Stormwater initial, -Paving (to check AB before paving) -Sidewalk Flatwork -Engineering Final. -Site Consultation, if needed. |