Permit: TD-DEV-0525-00143
Permit Details
Apply Date:
05/21/2025
Applicant:
Dillon Lopez
Description:
Rev 1 - update to foundation, aggregate, walls, started 03.04.2026 ** The proposed development consists of hybrid self-storage facility with 182 modular storage units placed above grade and a 1-megawatt solar panel system on storage units roof with battery backup. Site improvements will include grading and access drives.
Permit Reviews
Permit Number - TD-DEV-0525-00143
Permit Status: Issued
Permit Description: Rev 1 - update to foundation, aggregate, walls, started 03.04.2026 ** The proposed development consists of hybrid self-storage facility with 182 modular storage units placed above grade and a 1-megawatt solar panel system on storage units roof with battery backup. Site improvements will include grading and access drives.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/05/2025 | DEVELOPMENT PACKAGE NEW v.5 | 12/05/2025 | REQUIRES RESUBMIT |
| 07/31/2025 | DEVELOPMENT PACKAGE NEW v.3 | 09/22/2025 | REQUIRES RESUBMIT |
| 06/04/2025 | DEVELOPMENT PACKAGE NEW v.2 | 07/17/2025 | REQUIRES RESUBMIT |
| 09/26/2025 | DEVELOPMENT PACKAGE NEW v.4 | 10/24/2025 | REQUIRES RESUBMIT |
| 03/05/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 03/12/2026 | REQUIRES RESUBMIT |
| 03/04/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 03/04/2026 | REQUIRES RESUBMIT |
| 01/16/2026 | DEVELOPMENT PACKAGE NEW v.6 | 01/26/2026 | APPROVED |
| 03/12/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 03/12/2026 | APPROVED |
| 05/21/2025 | DEVELOPMENT PACKAGE NEW v.1 | 06/02/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0525-00143
Permite Description: Rev 1 - update to foundation, aggregate, walls, started 03.04.2026 ** The proposed development consists of hybrid self-storage facility with 182 modular storage units placed above grade and a 1-megawatt solar panel system on storage units roof with battery backup. Site improvements will include grading and access drives.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2026 | SITE - Stormwater Setup and Controls | N/A | Re-inspection required | SWWWP Board not ready and on fence by entrance. |
| 03/03/2026 | PDSD Engineering Division Pre-Construction SITE | N/A | Re-inspection required | |
| 03/17/2026 | N/A | Partial Pass | 3/17/26 I reviewed survey of current elevations and Top of base elevations (Final Elevation minus 10"-paving section). These figures were close enough to begin laying the 6" Filter layer. Bottom of planter 5 will need to be cut and other Planter bottoms adjusted as needed. Slope is correct. There is a benchmark set 0.0 at top of curb directly East of the fire hydrant on Fontana Avenue. There is another benchmark on top of curb directly south of telephone pole next to Southwest corner on Valencia. There is also a marked property corner at Northeast that lines up nicely with the footer dug for the wall. The grade slopes from Southeast to Northwest as indicated on plans. Drainage looks correct. OK to start paving. I would recommend Scheduling next grading inspection after filter layer is complete, planter bottoms are defined as well as Swale for RipRap along north end of property is ready. |
|
| 04/22/2026 | N/A | Canceled | ||
| 10/26/2026 | For trash and recycling enclosures | N/A | Partial Pass | Okay to pour refuse enclosure floor and apron. Bollard footers and reinforcing is correct. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0525-00143
Permit Description: Rev 1 - update to foundation, aggregate, walls, started 03.04.2026 ** The proposed development consists of hybrid self-storage facility with 182 modular storage units placed above grade and a 1-megawatt solar panel system on storage units roof with battery backup. Site improvements will include grading and access drives.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2026 | SITE - Stormwater Setup and Controls | Passed | 3/5/26 BMP's on site are in place except for construction entrance. The next step in construction is to place ABC When this is placed the need for construction entrance will be negated. It would not make sense to have him put in a construction entrance at this point. If this changes and more work must be done such as grading than Trackout would need to be installed. Contractor is aware that he needs to call in stormwater initial of the construction phase going forward and he is working in good faith. |
|
| 03/05/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 03/26/2026 | Passed |