Inspection History Details
Inspection Status: Re-inspection required
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - TD-DEV-0525-00143
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2026 | SITE - Stormwater Setup and Controls | Re-inspection required | SWWWP Board not ready and on fence by entrance. | |
| 03/05/2026 | SITE - Stormwater Setup and Controls | Passed | 3/5/26 BMP's on site are in place except for construction entrance. The next step in construction is to place ABC When this is placed the need for construction entrance will be negated. It would not make sense to have him put in a construction entrance at this point. If this changes and more work must be done such as grading than Trackout would need to be installed. Contractor is aware that he needs to call in stormwater initial of the construction phase going forward and he is working in good faith. |