Parcel: 13811073C


Addresses:

6444 S FONTANA AV


Inspection Status: Re-inspection required

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - TD-DEV-0525-00143

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
03/03/2026 SITE - Stormwater Setup and Controls Re-inspection required SWWWP Board not ready and on fence by entrance.
03/05/2026 SITE - Stormwater Setup and Controls Passed 3/5/26
BMP's on site are in place except for construction entrance. The next step in construction is to place ABC When this is placed the need for construction entrance will be negated. It would not make sense to have him put in a construction entrance at this point. If this changes and more work must be done such as grading than Trackout would need to be installed. Contractor is aware that he needs to call in stormwater initial of the construction phase going forward and he is working in good faith.