Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/16/2026 | Partial Pass | North wall Footer dimensions and reinforcing correct. 2 continuous #4 rebar with alternating #4 verts at 48" OC. Contractor will build wall w/ bond beam to 1 lift at 4'. Schedule pre-grout inspection before grouting 1st lift to check reinforcing. | ||
| 03/23/2026 | Partial Pass | 3/23/26 North Screen Wall Bond beam in place at 1st lift. Masons duct taped bond beam at expansion joints and verts in place at 48" OC. Okay to grout 1st lift. Grout all reinforced cells and bond beam. Vibrate all grout. Schedule wall inspection for pre grout when bond beam is in place at top of wall. Refuse Enclosure Inspection scheduled for 3/24. Okay to Grout 1st lift of refuse enclosure. Grout all reinforced cells and bond beam at bottom and vibrate all grout. Schedule Refuse Enclosure Inspection when ready for pre grout inspection with bond beam in place at top of wall. |
||
| 03/24/2026 | Partial Pass | 3/24/26 Bond beam is placed correct at top course. Ok to grout 2nd lift and bond beam and finish walls. Vibrate all grout. |
||
| 03/26/2026 | Passed |