Permit: TD-DEV-0525-00132
Permit Details
Status:
Needs Resubmittal
Type:
Development Package
Address:
5651 S HOUGHTON RD
Address NEW:
5651 S HOUGHTON RD
Apply Date:
05/09/2025
Applicant:
Dave Damitio
Description:
Rev 1 - update to transformer, storage shed, access ramp, pavement, started 01.30.2026 ** New McDonald's Site and Building
Permit Reviews
Permit Number - TD-DEV-0525-00132
Permit Status: Needs resubmittal
Permit Description: Rev 1 - update to transformer, storage shed, access ramp, pavement, started 01.30.2026 ** New McDonald's Site and Building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2026 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 03/19/2026 | APPROVED |
| 06/05/2026 | AS-BUILT v.1 | 06/12/2026 | REQUIRES RESUBMIT |
| 01/30/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 01/30/2026 | REQUIRES RESUBMIT |
| 07/14/2025 | DEVELOPMENT PACKAGE NEW v.2 | 08/08/2025 | REQUIRES RESUBMIT |
| 01/30/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 03/18/2026 | REQUIRES RESUBMIT |
| 05/09/2025 | DEVELOPMENT PACKAGE NEW v.1 | 06/16/2025 | REQUIRES RESUBMIT |
| 05/28/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/01/2026 | APPROVED |
| 08/28/2025 | DEVELOPMENT PACKAGE NEW v.3 | 09/03/2025 | APPROVED |
Conditions
Permit Number - TD-DEV-0525-00132
Permit Status: Needs resubmittal
Permit Description: Rev 1 - update to transformer, storage shed, access ramp, pavement, started 01.30.2026 ** New McDonald's Site and Building
| Date | Description | Comments |
|---|---|---|
| 07/31/2025 | Prior to project being finalized applicant must provide recorded documents for the water and electrical easements shown to be recorded under separate instruments on sheet SP1 of this DP |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TD-DEV-0525-00132
Permite Description: Rev 1 - update to transformer, storage shed, access ramp, pavement, started 01.30.2026 ** New McDonald's Site and Building
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2025 | N/A | Partial Pass | Contractors good to pour the footing through the retaining wall on the west side of the building | |
| 04/08/2026 | For trash and recycling enclosures | N/A | Partial Pass | Refuse enclosures' construction is in accordance with approved plan revision for wall height. Walls, slab, apron, and bollards are complete and acceptable. |
| 05/14/2026 | Consultation SITE | N/A | Partial Pass | contractor is good to pour the footer over on the north west corner of the building for grout and rip rap |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TD-DEV-0525-00132
Permit Description: Rev 1 - update to transformer, storage shed, access ramp, pavement, started 01.30.2026 ** New McDonald's Site and Building
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | informed the contractor that he needs to call in inspections for the trash enclosure and the sidewalk. And that we will be testing the subgrade the AB and the asphalt grade. Contractor needs to install track out rock and clean Houghton Road with the trucks have been exiting onto Houghton. | |
| 04/30/2026 | Passed | All retaining walls/structures are complete in accordance with approved plans. | ||
| 04/30/2026 | For trash and recycling enclosures | Passed | Refuse enclosures are complete in accordance with approved plans. | |
| 05/08/2026 | Passed | Site is graded to plans. Slopes are consistent with approved plans. No major cut or fill remain. | ||
| 05/19/2026 | SITE - Zoning Final | Passed | Site is complete in accordance with approved plans. | |
| 05/19/2026 | COT - ENGR - Signage Final | Passed | Signage and striping associated with Development package are complete in accordance with approved plans. | |
| 05/19/2026 | ENGR Paving | Passed | Paving is complete in accordance with approved plans. | |
| 05/19/2026 | Passed | All sidewalks and flatwork is complete in accordance with approved plans. | ||
| 05/28/2026 | ENGR Engineering Final | Passed | 5/28/26 - Site is complete in accordance with approved plans. | |
| 05/28/2026 | Final inspection to ensure all landscape and water harvesting SITE | Passed | Water harvesting areas are complete in accordance with approved plans. | |
| 05/28/2026 | LAND Landscape Appearance & Function Final | Passed | Landscape is complete in accordance with approved plans. | |
| 05/28/2026 | Passed | All irrigation equipment is installed and functional in accordance with approved plans. | ||
| 05/28/2026 | Passed | All parking, pedestrian circulation, and ADA items are complete in accordance with approved plans. |