Inspection Status: Not Ready
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2026 |
|
|
Not Ready |
All Flatwork is poured. Handicap parking currently has a dumpster on it but the areas I could check around it were okay. When dumpster is moved this should be rechecked... Running slope of 3 panels of sidewalk is over 5% at east sidewalk south of the curb ramp that connects to the crosswalk. These panels need to comply... The curb ramp just south of the Refuse Enclosure is a little too long and rise is over 6" but it is a service area so it is ok. There is another door landing on East side of building that is not correct but it is a service door... |
| 05/19/2026 |
|
|
Passed |
All sidewalks and flatwork is complete in accordance with approved plans. |