Permit: TD-DEV-0425-00111
Permit Details
Apply Date:
04/10/2025
Applicant:
Bryce Quigley
Description:
Expansion of the existing Larry H. Miller automotive dealership with a new service drive, Jeep showroom, and new vehicle delivery along with a new 12,000 sf service building.
Permit Reviews
Permit Number - TD-DEV-0425-00111
Permit Status: Inspections
Permit Description: Expansion of the existing Larry H. Miller automotive dealership with a new service drive, Jeep showroom, and new vehicle delivery along with a new 12,000 sf service building.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/07/2025 | DEVELOPMENT PACKAGE NEW v.4 | 08/29/2025 | APPROVED |
| 06/20/2025 | DEVELOPMENT PACKAGE NEW v.3 | 07/21/2025 | REQUIRES RESUBMIT |
| 06/18/2025 | DEVELOPMENT PACKAGE NEW v.2 | 06/20/2025 | REQUIRES RESUBMIT |
| 04/11/2025 | DEVELOPMENT PACKAGE NEW v.1 | 05/22/2025 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0425-00111
Permit Description: Expansion of the existing Larry H. Miller automotive dealership with a new service drive, Jeep showroom, and new vehicle delivery along with a new 12,000 sf service building.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting held on-site to discuss scope of project and inspection requirements. Advised that they get access to/keep on site a copy of the stamped plans to ensure that the most up to date drawings are being used. Below are the inspections needed for this project. Stormwater Initial: To confirm horizontal controls and SWPPP measures. (Also opens up inspections for site work) Sidewalk/Flatwork: For sidewalks, curb ramps, and valley gutter. Paving: For subgrade, AB, and asphalt. Striping & Signage: for lot lines and ADA signage. Landscape Final: for plantings and irrigation. Site Consultation: for general questions and inquiries. |
|
| 06/23/2026 | SITE - Stormwater Setup and Controls | Passed |