Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2026 | Partial Pass | Okay to continue flatwork/ramp pours. please provide as-built’s to date. | ||
| 09/22/2026 | Partial Pass | 9/22/26-Previously poured sidewalk east of showroom addition is over 2% cross slope in several panels. I will check to make sure that this is a service area and not a pedestrian route. If it is considered pedestrian access it will need to be corrected. Three curb ramps south of showroom addition on east end of sidewalk. Forms are at 8% slope. Ensure that they do not exceed 8.33% when poured. Okay to pour these ramps. 4th ramp on west end not ready. |