Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting held on-site to discuss scope of project and inspection requirements. Advised that they get access to/keep on site a copy of the stamped plans to ensure that the most up to date drawings are being used. Below are the inspections needed for this project. Stormwater Initial: To confirm horizontal controls and SWPPP measures. (Also opens up inspections for site work) Sidewalk/Flatwork: For sidewalks, curb ramps, and valley gutter. Paving: For subgrade, AB, and asphalt. Striping & Signage: for lot lines and ADA signage. Landscape Final: for plantings and irrigation. Site Consultation: for general questions and inquiries. |