Permit Details

Status:
Issued
Type:
Development Package
Address:
613 W ALTURAS ST
Apply Date:
03/28/2023
Applicant:
Vance Goodman
Description:
New multifamily duplex development with associated PAALs, parking & landscaping.

Permit Reviews

Permit Number - TD-DEV-0323-00192
Permit Status: Issued
Permit Description: New multifamily duplex development with associated PAALs, parking & landscaping.
Start Date Submittal Complete Date Status  
03/29/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/04/2023 REQUIRES RESUBMIT Review Details
04/13/2023 DEVELOPMENT PACKAGE REVIEW v.2 05/24/2023 REQUIRES RESUBMIT Review Details
08/01/2023 DEVELOPMENT PACKAGE NEW v.3 08/08/2023 APPROVED Review Details
06/29/2023 DEVELOPMENT PACKAGE NEW v.1 07/28/2023 REQUIRES RESUBMIT Review Details
07/31/2023 DEVELOPMENT PACKAGE NEW v.2 08/01/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0323-00192
Permite Description: New multifamily duplex development with associated PAALs, parking & landscaping.
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
01/09/2024 PDSD Site/Engineering Division - Landscaping N/A Partial Pass Rough grading in progress
11/30/2023 SITE N/A Partial Pass Demolition in progress at this time
06/20/2024 SITE - Stormwater Setup and Controls N/A Not Ready provide stormwater controls as needed. Protect material piles and site perimeter contain all materials within job site
11/15/2023 PDSD Site/Engineering Division - NPPO N/A Partial Pass
08/13/2024 ENGR Grading Final N/A Partial Pass contractor just now cutting grade for Roads and curb. I’m not cut in the basin yet landscape has not started yet.
11/15/2023 COT - ENGR - Stormwater N/A Partial Pass
11/18/2024 For trash and recycling enclosures N/A Not Ready
11/18/2024 SITE - Stormwater Follow-up N/A Complete (Recurring) No concerns at this time
11/29/2024 Consultation SITE N/A Not Ready Visited site - required ground cover, and fencing not in place or insufficient. Not ready for a TCO at this time.
12/03/2024 COT - FCON - Fire - Final N/A Re-inspection required
11/25/2024 ENGR - Drainage Structures N/A Not Ready Basins are not completed yet contractors still working on them

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0323-00192
Permit Description: New multifamily duplex development with associated PAALs, parking & landscaping.
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/13/2023 PDSD Engineering Division Pre-Construction SITE Passed schedule inspections for Stormwater controls once installed. Provide biweekly stormwater. Follow up inspections. Inspections required for trash enclosures and for all accessible pathways in parking.
Perimeter, sidewalks shown on plan or outside of property line and require inspection from department of transportation, right of way.
08/30/2024 Passed Grading is at the intermediate to final stages even in some areas. All rough grading is completed. slopes look good

Documents

File Name Document Type  
APPROVED DEVELOPMENT LETTER-MERGE.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - NPPO LETTER OF EXCEPTION_V1.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - SWPPP_V1.PDF DOCUMENTS VIEW
TD-DEV-0323_00192 1_PDMR_V1.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
TD-DEV-0323_00192 2_DRN REVISED DRAINAGE STATEMENT 7.17.23_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
FUGITIVE DUST PERMIT 613_615 W ALTURAS ST_V1.PDF DOCUMENTS VIEW
PDSD APPROVED (1)TD-DEV-0323_00192 3_DP_V1_V1.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - NPPO LETTER OF EXCEPTION_V1.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT LETTER-MERGE.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - SWPPP_V1.PDF DOCUMENTS VIEW
TD-DEV-0323_00192 1_PDMR_V1.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
TD-DEV-0323_00192 2_DRN REVISED DRAINAGE STATEMENT 7.17.23_V2.PDF DOCUMENTS VIEW
FUGITIVE DUST PERMIT 613_615 W ALTURAS ST_V1.PDF DOCUMENTS VIEW
PDSD APPROVED (1)TD-DEV-0323_00192 3_DP_V1_V1.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - SWPPP_V1.PDF DOCUMENTS VIEW
TD-DEV-0323_00192 1_PDMR_V1.PDF DOCUMENTS VIEW
TD-DEV-0323_00192 2_DP 1ST RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
TD-DEV-0323_00192 2_DP_V3.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - NPPO LETTER OF EXCEPTION_V1.PDF DOCUMENTS VIEW
FACILITIES MAP WO T74466.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT LETTER-MERGE.PDF DOCUMENTS VIEW
1_SLEEPY HOLLOW - NPPO LETTER OF EXCEPTION_V1.PDF PLANS UNDER REVIEW VIEW
1_SLEEPY HOLLOW - GEOTECHNICAL REPORT_V1.PDF PLANS UNDER REVIEW VIEW
1_SLEEPY HOLLOW - DRAINAGE REPORT_V1.PDF PLANS UNDER REVIEW VIEW
1_SLEEPY HOLLOW - DP PLAN SET_V1.PDF PLANS UNDER REVIEW VIEW
1_SLEEPY HOLLOW - DP PLAN SET REV_V2.PDF PLANS UNDER REVIEW VIEW
1_SLEEPY HOLLOW - SWPPP_V1.PDF PLANS UNDER REVIEW VIEW