Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - ENGR - Stormwater
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2024 | COT - ENGR - Stormwater | Partial Pass | Utility work, grading and building construction in progress. Joseph Adler With Canyon inquiring about sewer inspections. I told him to contact Ernie Stevens. Track out issues have been corrected. | |
| 02/21/2025 | COT - ENGR - Stormwater | Complete (Recurring) | ||
| 03/20/2025 | COT - ENGR - Stormwater | Complete (Recurring) | No concerns at this time | |
| 06/20/2024 | COT - ENGR - Stormwater | Partial Pass | provide stormwater controls as needed. Protect material piles and site perimeter contain all materials within job site | |
| 08/27/2024 | COT - ENGR - Stormwater | Partial Pass | Contractor pour the floors for the catch basin on the south end | |
| 10/12/2023 | COT - ENGR - Stormwater | Partial Pass | Cesar with Canyon builders. Eagle rock. Sleepy Hollow project. Provide SWPPP, post to addresses provide controls as required. Install temporary fencing. | |
| 10/31/2023 | COT - ENGR - Stormwater | Partial Pass | ||
| 11/15/2023 | COT - ENGR - Stormwater | Partial Pass | ||
| 11/30/2023 | COT - ENGR - Stormwater | Partial Pass | track out protection provided at East entrance. No protections in place at north entrance, minor check out noted on Alturas st. Demolition in progress at this time. No other stormwater controls provided at this time. |