Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Cesar with Canyon builders. 520-331-0745 Eagle rock contractors. Sleepy, hollow |
|
| 10/13/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | schedule inspections for Stormwater controls once installed. Provide biweekly stormwater. Follow up inspections. Inspections required for trash enclosures and for all accessible pathways in parking. Perimeter, sidewalks shown on plan or outside of property line and require inspection from department of transportation, right of way. |