Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Stormwater Follow-up
Permit Number - TD-DEV-0323-00192
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/06/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
02/16/2024 | SITE - Stormwater Follow-up | Partial Pass | Track out noted | |
04/09/2024 | SITE - Stormwater Follow-up | Partial Pass | Track out noted. Utility work and building progress. | |
06/20/2024 | SITE - Stormwater Follow-up | Partial Pass | provide stormwater controls as needed. Protect material piles and site perimeter contain all materials within job site | |
08/27/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
09/20/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time for this site all storm order controls appear to be working and in good compliance | |
11/15/2023 | SITE - Stormwater Follow-up | Partial Pass | Please post site address Provide track out protection as needed |
|
11/18/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time | |
11/25/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Stormwater biweekly inspections, no concerns at this time everything still in place | |
12/13/2023 | SITE - Stormwater Follow-up | Partial Pass | utility work on and offsite. Joseph With Canyon. Demo, Grading, and material hauling | |
12/20/2023 | SITE - Stormwater Follow-up | Partial Pass | Track out noted. Please sweep streets as needed. Provide controls to mitigate. |