Permit Details

Status:
Inspections
Type:
Development Package
Address NEW:
10080 E OLD VAIL RD
Apply Date:
02/05/2026
Applicant:
Blake Junak
Description:
New commercial fitness center

Permit Reviews

Permit Number - TD-DEV-0226-00034
Permit Status: Inspections
Permit Description: New commercial fitness center
Start Date Submittal Complete Date Status  
06/15/2026 DEVELOPMENT PACKAGE NEW v.3 06/25/2026 APPROVED Review Details
02/05/2026 DEVELOPMENT PACKAGE NEW v.1 03/10/2026 REQUIRES RESUBMIT Review Details
05/06/2026 DEVELOPMENT PACKAGE NEW v.2 06/01/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TD-DEV-0226-00034
Permit Status: Inspections
Permit Description: New commercial fitness center
Date Description Comments
06/25/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/25/2026 Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's)

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0226-00034
Permit Description: New commercial fitness center
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/06/2026 PDSD Engineering Division Pre-Construction SITE Passed Meeting held on-site, scope of project and inspections expectations were discussed. Necessary inspections are listed below.
Stormwater Initial: once controls are in place and signage is posted
Refuse enclosure: prior to covering any rebar
Drainage pipe/structure: for stormwater catch basins and V- ditch
Paving: for sub-grade, AB, and asphalt
Sidewalk/flatwork: to ensure sidewalks are within tolerance
Landscape: to confirm plantings and irrigation work
Grading progress: to check on site elevations
Striping: to check parking lines and ADA spaces
Site consultation: for general questions/site visits