| 11/02/2026 |
|
|
Partial Pass |
Curb at West side of parking lot and formed section to NE okay to pour. |
| 11/05/2026 |
|
|
Partial Pass |
Continuation of curb at North End. Forms good and correct to PAG 209. Okay to pour formed curb. |
| 11/10/2026 |
|
|
Partial Pass |
Pedestrian access from building and across PAALs to islands should not have steps. Curb ramp at building sidewalk needs to be built and sidewalk at islands should be at same grade as asphalt. Do not pour bullnoses as currently designed. Strait 6" curb okay to pour. |
| 11/13/2026 |
|
|
Partial Pass |
Okay to proceed with sidewalk as planned across sidewalk islands from main entrance running west into parking lot. |