Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting held on-site, scope of project and inspections expectations were discussed. Necessary inspections are listed below. Stormwater Initial: once controls are in place and signage is posted Refuse enclosure: prior to covering any rebar Drainage pipe/structure: for stormwater catch basins and V- ditch Paving: for sub-grade, AB, and asphalt Sidewalk/flatwork: to ensure sidewalks are within tolerance Landscape: to confirm plantings and irrigation work Grading progress: to check on site elevations Striping: to check parking lines and ADA spaces Site consultation: for general questions/site visits |