Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
Floor for peg 309 type four catch basin at SE corner is poured correct. Schedule inspection for when wall forms and reinforcing is ready for inspection before next pour |
| 09/30/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
|
| 10/14/2026 |
ENGR - Drainage Structures |
|
Partial Pass |
Floor for PAG 309 double type 4 CB. Clean up around 12' at edges to reach 8" depth for floor. Okay to pour floor and wet set verts |
| 10/15/2026 |
ENGR - Drainage Structures |
|
Not Ready |
Drainpipe inspection. 18" HDPE from double PAG 309 catch basin at far SE of site- connecting to existing 3’ drainage pipe. Engineered RFI for rerouting because of electrical line. Clean out in place correct but connection to 3 foot drain pipe is not correct to ADOT SD 13–70 it is not between 45 and 90°. Reschedule when ready |
|
ENGR - Drainage Structures |
|
Scheduled |
|