Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0123-00109
Permit Details
Status:
Inspections
Type:
Development Package
Address:
5500 S NOGALES HY
Address NEW:
5500 S NOGALES HY
Apply Date:
01/17/2023
Applicant:
Cody Conca
Description:
DP Development Package for Fire Station No 14 T22PRE0244 Pre Application Submittal. Also Note the county has assign the address of 5500 South Nogales Highway to this property and the APN number for the lot is pending.
Permit Reviews
Permit Number - TD-DEV-0123-00109
Permit Status: Inspections
Permit Description: DP Development Package for Fire Station No 14 T22PRE0244 Pre Application Submittal. Also Note the county has assign the address of 5500 South Nogales Highway to this property and the APN number for the lot is pending.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2023 | DEVELOPMENT PACKAGE NEW v.1 | 11/01/2023 | APPROVED |
| 03/23/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 05/23/2023 | REQUIRES RESUBMIT |
| 01/18/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/06/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0123-00109
Permite Description: DP Development Package for Fire Station No 14 T22PRE0244 Pre Application Submittal. Also Note the county has assign the address of 5500 South Nogales Highway to this property and the APN number for the lot is pending.
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | No concerns at this time |
| 11/19/2024 | Consultation SITE | N/A | Partial Pass | inform the contractor he need to call in every two weeks biweekly for the swept and for any inspections away from the building that belong to the DP department. The walls that have been installed at this time has been inspected by building department. Also inform him that everything away from the building belong to the DP departmentlandscaping catch basins drainage. Basins will be doing the inspections, parking, lots, handicap, ramps, etc. be done by us. |
| 09/05/2025 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | 100 lb pressure test hold for 24 hours |
| 06/25/2025 | SITE | N/A | Canceled | |
| 05/30/2025 | ENGR Grading Final | N/A | Partial Pass | 05/30/25, All grades and pours look good to date, compaction test are coming in to meet spec. |
| 12/23/2024 | N/A | Partial Pass | Footings inspection on the south side of the site passed 12/23/24 | |
| 10/22/2025 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Not Ready | Landscaping is incomplete |
| 10/22/2025 | ENGR Engineering Final | N/A | Not Ready | Site still under construction. no lanscaping, striping, etc. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0123-00109
Permit Description: DP Development Package for Fire Station No 14 T22PRE0244 Pre Application Submittal. Also Note the county has assign the address of 5500 South Nogales Highway to this property and the APN number for the lot is pending.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 02/18/2025 | SITE - Stormwater Follow-up | Passed | No issues at this time | |
| 05/08/2025 | Consultation SITE | Passed | It was found that the NPPO inspection had never been completed holding up all other inspections. Compaction test to date have been received. Final grade inspections need to be done prior to any final concrete or paving is completed. | |
| 05/08/2025 | COT - ENGR - Stormwater | Passed | ||
| 05/09/2025 | NPPO Pre-Construction | Passed | 1 cactus to move, barrel. | |
| 05/15/2025 | SITE - Stormwater Setup and Controls | Passed | ||
| 06/25/2025 | For trash and recycling enclosures | Passed | Trash enclosure is completed other than paint on doors and holes drilled for lock downs on doors, this can be seen at final. | |
| 09/05/2025 | ENGR Grading Final | Passed | ||
| 09/05/2025 | Passed | All walls are completed and passed |