| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | Partial Pass | Partial pass, I will return on Jan. 27th to observe grout has penetrated all rows of block. This is in sections a 5' to 6' pour. | ||
| 01/28/2025 | Partial Pass | Observation of grout being installed was done on 01/28/25, observation holes had been produced at bottom of wall and grout was flowing through. | ||
| 02/18/2025 | Partial Pass | 8' wall is okay to grout, research is being done to check if change in hgt. will require resubmitting of plan or as built and checking with zoning on the height requirements | ||
| 02/25/2025 | Partial Pass | Stem wall for refuse enclosure, good to pour. 02/25/25 | ||
| 03/06/2025 | Partial Pass | Everything looks good, please do the weep holes at all rebar locations. | ||
| 03/21/2025 | Partial Pass | pad and bollards good to pour on the refuse enclosure, 03,21,25 | ||
| 05/28/2025 | Partial Pass | Grout inspect remainder of the south wall at the corner of the fire station. Good to pour footing | ||
| 06/25/2025 | Partial Pass | Site perimeter wall is completed. Walls to easy side of gate to rear entrance are above the 6’ mark. This might need a review to be at 8’ | ||
| 07/22/2025 | Partial Pass | Footing for flag pole and monument sign is good to pour. Send me a picture of the ground wire. | ||
| 08/07/2025 | Partial Pass | 08/07/25, Base and monument for the flag pole good to pour. | ||
| 09/05/2025 | Passed | All walls are completed and passed | ||
| 12/23/2024 | Partial Pass | Footings inspection on the south side of the site passed 12/23/24 |