Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2025 | ENGR Engineering Final | Not Ready | Site still under construction. no lanscaping, striping, etc. | |
| 12/22/2025 | ENGR Engineering Final | Not Ready | Missing splash block on south side of building (next to gas meter) Downspouts discharge overtop of sidewalk on east side of building (under TFD sign) Splash block not grouted on east side of building (near public entrance) Downspouts discharge overtop of sidewalk on west side (by rear entrance) Splash blocks (2) not grouted on northwest side (rear of gate, by astroturfing) |
|
| 12/30/2025 | ENGR Engineering Final | Passed |