Permit: TC-RES-1222-01528
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1028 W COLUMBIA ST
Address NEW:
1028 W COLUMBIA ST
Apply Date:
12/14/2022
Applicant:
Luis Benitez
Description:
REV1: Removed bathroom door Single Family Dwelling
Permit Reviews
Permit Number - TC-RES-1222-01528
Permit Status: Complete
Permit Description: REV1: Removed bathroom door
Single Family Dwelling
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/19/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | 04/03/2026 | APPROVED |
| 12/13/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/02/2024 | APPROVED |
| 04/26/2023 | RESIDENTIAL NEW DWELLING v.2 | 05/18/2023 | APPROVED |
| 02/08/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/02/2023 | REQUIRES RESUBMIT |
| 09/22/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/22/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1222-01528
Permit Status: Complete
Permit Description: REV1: Removed bathroom door
Single Family Dwelling
| Date | Description | Comments |
|---|---|---|
| 01/02/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1222-01528
Permite Description: REV1: Removed bathroom door
Single Family Dwelling
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | BULD - Electrical Clearance | N/A | Not Ready | 11/13/24 not ready. box is empty. no temporary power. |
| 01/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1/16/25: HVAC registers require blocks on 3 sides, DWV Must be under test, nail plates required throughout at top plates and bottom plates and in wall(plumbing,electrical, mechanical) anything within 1 1/4" of face of stud, seal all penetrations through top plates and vapor barrier throughout, pex must have a 12" clearance from can lights, pressure relief for water heater discharge not roughed in, 18" of copper required before first solder joint at pex, water lines not under pressure. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 02/18/2026 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 2.18.26 Water hammer arrestor required at dishwasher hot line Outdoor lighting not installed Exposed whip for garage door box Revision required for removal of glass door in master bathroom WR (weather resistant) receptacles required at outdoor areas Any and all circuits serving interior livable outlets and receptacles must be under AFCI protected breakers |
| 02/18/2026 | COT - RSEL - Electrical Underground | N/A | Re-inspection required | 2.18.26 Water hammer arrestor required at dishwasher hot line Outdoor lighting not installed Exposed whip for garage door box Revision required for removal of glass door in master bathroom WR (weather resistant) receptacles required at outdoor areas Any and all circuits serving interior livable outlets and receptacles must be under AFCI protected breakers |
| 02/18/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 2.18.26 Water hammer arrestor required at dishwasher hot line Outdoor lighting not installed Exposed whip for garage door box Revision required for removal of glass door in master bathroom WR (weather resistant) receptacles required at outdoor areas Any and all circuits serving interior livable outlets and receptacles must be under AFCI protected breakers |
| 02/18/2026 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 2.18.26 Water hammer arrestor required at dishwasher hot line Outdoor lighting not installed Exposed whip for garage door box Revision required for removal of glass door in master bathroom WR (weather resistant) receptacles required at outdoor areas Any and all circuits serving interior livable outlets and receptacles must be under AFCI protected breakers |
| 02/18/2026 | RSBU - Building Final | N/A | Re-inspection required | 2.18.26 Water hammer arrestor required at dishwasher hot line Outdoor lighting not installed Exposed whip for garage door box Revision required for removal of glass door in master bathroom WR (weather resistant) receptacles required at outdoor areas Any and all circuits serving interior livable outlets and receptacles must be under AFCI protected breakers |
| 02/18/2026 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 2.18.26 Water hammer arrestor required at dishwasher hot line Outdoor lighting not installed Exposed whip for garage door box Revision required for removal of glass door in master bathroom WR (weather resistant) receptacles required at outdoor areas Any and all circuits serving interior livable outlets and receptacles must be under AFCI protected breakers |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1222-01528
Permit Description: REV1: Removed bathroom door
Single Family Dwelling
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2024 | COT - RSPL - Rough Soil | Passed | ||
| 02/21/2024 | COT - RSBU - Preslab | Passed | 2/21/24: reinforcement per plans ok to pour. | |
| 02/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2/21/24: reinforcement per plans ok to pour. | |
| 06/12/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/9/2024 | |
| 11/15/2024 | BULD - Electrical Clearance | Passed | 11/15/24 clearance for TEP ECO | |
| 01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/22/25 corrections made, no further issues found | |
| 02/11/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2/11/25 pass | |
| 02/18/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/18/2026 | COT - RSPL - Sewer | Passed | ||
| 05/19/2026 | COT - RSME - Mechanical Final | Passed | 5-19-26: approved. | |
| 05/19/2026 | COT - RSEL - Electrical Underground | Passed | 5-19-26: approved. | |
| 05/19/2026 | COT - RSEL - Electrical Final | Passed | 5-19-26: electrical final approved. | |
| 05/19/2026 | COT - RSEL - Outdoor Lighting | Passed | 5-19-26: approved. | |
| 05/28/2026 | RSBU - Building Final | Passed | 5-28-26: building final approved. | |
| 05/28/2026 | COT - RSPL - Plumbing Final | Passed | 5-28-26: plumbing final approved. | |
| 05/28/2026 | ENGR Engineering Final | Passed |