Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof NailingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2024 |
COT - RSBU - Roof NailingĀ |
|
Re-inspection required |
6/7/24: gable end cross brace not per plan, anchor bolts 12" max from edge of sill plate , anchor bolts not properly fastened, H3 missing at headers and king studs/jack studs and to sill plate, per IRC 2 jack studs and 2 king studs required at openings greater than 5', ram set shot pins not at proper spacing at interior shear wall, not truss clacs, framing not per plan at master, please provide access to all columns supporting beams. |
| 06/12/2024 |
COT - RSBU - Roof NailingĀ |
|
Passed |
|