Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
5925 S EUCLID AV
Address NEW:
5925 S EUCLID AV
Apply Date:
10/23/2023
Applicant:
Marcella Gutierrez
Description:
Bathrooms, Bathroom and Laundry Addition

Permit Reviews

Permit Number - TC-RES-1023-08985
Permit Status: Inspections
Permit Description: Bathrooms, Bathroom and Laundry Addition
Start Date Submittal Complete Date Status  
02/29/2024 RESIDENTIAL NEW DWELLING v.3 04/02/2024 REQUIRES RESUBMIT Review Details
01/12/2024 RESIDENTIAL NEW DWELLING v.2 01/23/2024 REQUIRES RESUBMIT Review Details
05/17/2024 RESIDENTIAL NEW DWELLING v.4 06/10/2024 APPROVED Review Details
10/24/2023 RESIDENTIAL NEW DWELLING v.1 11/08/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-1023-08985
Permit Status: Inspections
Permit Description: Bathrooms, Bathroom and Laundry Addition
Date Description Comments
06/10/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
11/08/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-1023-08985
Permite Description: Bathrooms, Bathroom and Laundry Addition
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/17/2025 COT - RSBU - Stem Wall/Retaining Wall N/A Partial Pass 4/17/25
Partial pass, please request next inspection at 4' lift.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1023-08985
Permit Description: Bathrooms, Bathroom and Laundry Addition
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and setback per schedule, ok to pour concrete 12/9/24
07/08/2026 COT - RSBU - Stem Wall/Retaining Wall Passed 07/08/2026
Final lift at CMU walls, verified added second #4 rebar at top bond beam. Okay to grout.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MG PLANS_V4.PDF DOCUMENTS VIEW