Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Stem Wall/Retaining Wall
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2025 | COT - RSBU - Stem Wall/Retaining Wall | Re-inspection required | 3/10/25: reinforcement at stem wall not Ready, Overlap at vertical reinforcement will not be met at first lift. Engineer will need to discuss possible solutions and revision is required. | |
| 04/17/2025 | COT - RSBU - Stem Wall/Retaining Wall | Partial Pass | 4/17/25 Partial pass, please request next inspection at 4' lift. |
|
| 07/03/2025 | COT - RSBU - Stem Wall/Retaining Wall | Partial Pass | 7/3/2025 1st lift approved. All around. Okay to grout progress areas | |
| 07/08/2026 | COT - RSBU - Stem Wall/Retaining Wall | Passed | 07/08/2026 Final lift at CMU walls, verified added second #4 rebar at top bond beam. Okay to grout. |