Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
04/15/2024
Applicant:
Franco Chimienti
Description:
SFR

Permit Reviews

Permit Number - TC-RES-0424-02260
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
09/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/20/2024 APPROVED Review Details
04/17/2024 RESIDENTIAL NEW DWELLING v.1 05/20/2024 REQUIRES RESUBMIT Review Details
05/22/2024 RESIDENTIAL NEW DWELLING v.2 06/28/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0424-02260
Permit Status: Issued
Permit Description: SFR
Date Description Comments
06/28/2024 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
05/02/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0424-02260
Permit Description: SFR
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/28/2024 COT - RSPL - Rough Soil Passed 8/27/24: plumbing underground not per plan (revision required for changes made), tracer wire required at HCS connection, possible leak at master bath, release air from system to achieve 5 pounds of pressure. Shading material required due to rocky conditions.
8/28/24: corrections made. Shading provided at time of inspection.
09/03/2024 COT - RSBU - Preslab Passed 9/3/24: reinforcement at slab per plans ok to proceed with pour.
09/30/2024 COT - RSBU - Roof Nailing Passed 9/23/24: Strapping at garage opening required per plans, anchor bolts at garage perimeter wall must be 32" o.c, Anchor bolts required 12" from edge of sill plate, shot pins required at interior walls, 2- king studs required at opening greater than 3' 6", anchor bolt spacing greater than 48" o.c at bearing perimeter walls. Plans call for 2- 2x12 at ledgers, window sills must not be higher than 44" high, correct hanger must be installed at truss, fire blocking required at garage, straps required at back patio entrance, no truss clacs provided, no ladder access.
10/02/2024 COT - RSBU - Exterior Clips/Sheathing Passed 10/2/2024 corrections were made.
10/02/2024 COT - RSBU - Interior Shear Bracing Passed

Documents

File Name Document Type  
R84243616.2411641-A_V1.PDF DOCUMENTS VIEW
2411641A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-FATATO RESIDENCE 05202024 FULL SET REV_1_V2.PDF DOCUMENTS VIEW