Permit: TC-RES-0323-03447
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3325 N FORGEUS AV
Address NEW:
3325 N FORGEUS AV
Apply Date:
03/08/2023
Applicant:
BRIAN STOVER
Description:
Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
Permit Reviews
Permit Number - TC-RES-0323-03447
Permit Status: Complete
Permit Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2024 | RESIDENTIAL NEW DWELLING v.6 | 03/28/2024 | APPROVED |
| 06/28/2023 | RESIDENTIAL NEW DWELLING v.3 | 07/31/2023 | REQUIRES RESUBMIT |
| 12/26/2023 | RESIDENTIAL NEW DWELLING v.5 | 01/24/2024 | REQUIRES RESUBMIT |
| 10/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/15/2024 | APPROVED |
| 03/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 04/06/2023 | REQUIRES RESUBMIT |
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | REQUIRES RESUBMIT |
| 10/16/2023 | RESIDENTIAL NEW DWELLING v.4 | 11/20/2023 | REQUIRES RESUBMIT |
| 05/04/2023 | RESIDENTIAL NEW DWELLING v.2 | 05/30/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0323-03447
Permit Status: Complete
Permit Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
| Date | Description | Comments |
|---|---|---|
| 03/28/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03447
Permite Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 04/09/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 4/9/24: Arc-fault breakers missing at multiple locations in sub-panel, WR receptacles required on exterior, mini split refrigerant lines need to be properly supported and UV coated, Electrical at mini split needs to be properly supported. mini split and water heater need disconnect boxes, T&P needs to be installed at Water heater, GFCI required at bathroom, hose bib needs vacuum breaker and proper insulation and UV coat, licensed (plumber,electrician and HVAC) will need to provide letters stating that all work done in casita meets or exceeds 2018 IRC prior to final. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0323-03447
Permit Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/05/2024 | COT - RSBU - Preslab | Passed | ||
| 04/05/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 04/05/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/05/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/05/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/09/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/09/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4/9/24: Arc-fault breakers missing at multiple locations in sub-panel, WR receptacles required on exterior, mini split refrigerant lines need to be properly supported and UV coated, Electrical at mini split needs to be properly supported. mini split and water heater need disconnect boxes, T&P needs to be installed at Water heater, GFCI required at bathroom, hose bib needs vacuum breaker and proper insulation and UV coat, licensed (plumber,electrician and HVAC) will need to provide letters stating that all work done in casita meets or exceeds 2018 IRC prior to final. | |
| 08/19/2024 | COT - RSEL - Electrical Final | Passed | ||
| 08/19/2024 | COT - RSME - Mechanical Final | Passed | ||
| 09/30/2024 | RSBU - Building Final | Passed | 9/30/24: owner submitted letter from crontractor stating plumbing meets 2018 code and approved plans | |
| 09/30/2024 | COT - RSPL - Sewer | Passed | 9/30/24: owner submitted letter from crontractor stating plumbing meets 2018 code and approved plans | |
| 09/30/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/30/2024 | COT - RSPL - Rough Soil | Passed | 9/30/24: owner submitted letter from crontractor stating plumbing meets 2018 code and approved plans |