Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
3325 N FORGEUS AV
Apply Date:
03/08/2023
Applicant:
BRIAN STOVER
Description:
Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304

Permit Reviews

Permit Number - TC-RES-0323-03447
Permit Status: Complete
Permit Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
Start Date Submittal Complete Date Status  
02/27/2024 RESIDENTIAL NEW DWELLING v.6 03/28/2024 APPROVED Review Details
06/28/2023 RESIDENTIAL NEW DWELLING v.3 07/31/2023 REQUIRES RESUBMIT Review Details
12/26/2023 RESIDENTIAL NEW DWELLING v.5 01/24/2024 REQUIRES RESUBMIT Review Details
10/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/15/2024 APPROVED Review Details
03/20/2023 RESIDENTIAL NEW DWELLING v.1 04/06/2023 REQUIRES RESUBMIT Review Details
10/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/09/2024 REQUIRES RESUBMIT Review Details
10/16/2023 RESIDENTIAL NEW DWELLING v.4 11/20/2023 REQUIRES RESUBMIT Review Details
05/04/2023 RESIDENTIAL NEW DWELLING v.2 05/30/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0323-03447
Permit Status: Complete
Permit Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
Date Description Comments
03/28/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0323-03447
Permite Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/09/2024 BULD - Electrical Clearance N/A Not Applicable
04/09/2024 COT - RSEL - Electrical Final N/A Re-inspection required 4/9/24: Arc-fault breakers missing at multiple locations in sub-panel, WR receptacles required on exterior, mini split refrigerant lines need to be properly supported and UV coated, Electrical at mini split needs to be properly supported. mini split and water heater need disconnect boxes, T&P needs to be installed at Water heater, GFCI required at bathroom, hose bib needs vacuum breaker and proper insulation and UV coat, licensed (plumber,electrician and HVAC) will need to provide letters stating that all work done in casita meets or exceeds 2018 IRC prior to final.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0323-03447
Permit Description: Detached Office with Bathroom and Additional Block Wall - CE-VIO0123-01304
Total Completed Inspections - 15
Date Description Inspector Results Comments
04/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/05/2024 COT - RSBU - Preslab Passed
04/05/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
04/05/2024 COT - RSBU - Roof Nailing Passed
04/05/2024 COT - RSEL - Grounding/Bonding Passed
04/05/2024 COT - RSEL - Outdoor Lighting Passed
04/09/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/09/2024 COT - RSBU - Interior Shear Bracing Passed
04/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/9/24: Arc-fault breakers missing at multiple locations in sub-panel, WR receptacles required on exterior, mini split refrigerant lines need to be properly supported and UV coated, Electrical at mini split needs to be properly supported. mini split and water heater need disconnect boxes, T&P needs to be installed at Water heater, GFCI required at bathroom, hose bib needs vacuum breaker and proper insulation and UV coat, licensed (plumber,electrician and HVAC) will need to provide letters stating that all work done in casita meets or exceeds 2018 IRC prior to final.
08/19/2024 COT - RSEL - Electrical Final Passed
08/19/2024 COT - RSME - Mechanical Final Passed
09/30/2024 RSBU - Building Final Passed 9/30/24: owner submitted letter from crontractor stating plumbing meets 2018 code and approved plans
09/30/2024 COT - RSPL - Sewer Passed 9/30/24: owner submitted letter from crontractor stating plumbing meets 2018 code and approved plans
09/30/2024 COT - RSEL - Electrical Underground Passed
09/30/2024 COT - RSPL - Rough Soil Passed 9/30/24: owner submitted letter from crontractor stating plumbing meets 2018 code and approved plans

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PDSD_OWNER_BUILDER_AFFIDAVIT_V1.PDF DOCUMENTS VIEW
GUEST HOUSE FINAL_V3_V4.PDF DOCUMENTS VIEW
DECISION.PDF SPECIAL APPLICATIONS VIEW
DDO APPLICATION AND PLANS.PDF SPECIAL APPLICATIONS VIEW
DDO NOTICE AND MAP.PDF SPECIAL APPLICATIONS VIEW