Permit: TC-RES-0125-00531
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3031 S SUNSET VILLA AV UNIT 2
Address NEW:
3031 S SUNSET VILLA AV UNIT 2
Apply Date:
01/28/2025
Applicant:
Oscar Delgado
Description:
ADU Casita
Permit Reviews
Permit Number - TC-RES-0125-00531
Permit Status: Complete
Permit Description: ADU Casita
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/07/2025 | RESIDENTIAL NEW DWELLING v.2 | 03/12/2025 | REQUIRES RESUBMIT |
| 08/19/2025 | RESIDENTIAL ADU REVISION v.1 | 09/11/2025 | APPROVED |
| 03/18/2025 | RESIDENTIAL NEW DWELLING v.3 | 04/16/2025 | REQUIRES RESUBMIT |
| 11/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/25/2025 | APPROVED |
| 04/18/2025 | RESTAMP - RESIDENTIAL v.1 | 04/21/2025 | APPROVED |
| 04/17/2025 | RESIDENTIAL NEW DWELLING v.5 | 04/18/2025 | APPROVED |
| 02/03/2025 | RESIDENTIAL NEW DWELLING v.1 | 02/03/2025 | REQUIRES RESUBMIT |
| 04/17/2025 | RESIDENTIAL NEW DWELLING v.4 | 04/17/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0125-00531
Permit Status: Complete
Permit Description: ADU Casita
| Date | Description | Comments |
|---|---|---|
| 04/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/25/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00531
Permite Description: ADU Casita
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 6/4/25: Fastners shall penetrate no more than 1/8" and shall be no closer than 3/8" from edge of sheathing. Spacing at sheathing not per plan at north west corner of home (marked in red), shot pins required 6" from edge of sill plate, truss clacs must be provided at time of inspection, 2x4 at nailer truss must be spaced 24" o.c, |
| 06/04/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 6/4/25: Fastners shall penetrate no more than 1/8" and shall be no closer than 3/8" from edge of sheathing. Spacing at sheathing not per plan at north west corner of home (marked in red), shot pins required 6" from edge of sill plate, truss clacs must be provided at time of inspection, 2x4 at nailer truss must be spaced 24" o.c, |
| 06/04/2025 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/09/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 10-9-25: not applicable. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00531
Permit Description: ADU Casita
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | COT - RSPL - Rough Soil | Passed | 5-8-25, underground plumbing verified per approved plans. Okay to backfill-shading required. | |
| 05/22/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/22/2025 | COT - RSBU - Preslab | Passed | ||
| 06/06/2025 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 6/6/2025 | |
| 06/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved. All items have been completed. 6/6/2025 | |
| 06/06/2025 | COT - RSBU - Roof Nailing | Passed | Approved. All items have been completed. 6/6/2025 | |
| 06/10/2025 | COT - RSEL - Electrical Underground | Passed | Underground approved. Pending riser at ADU. Okay to backfill progress areas. Shading required. 6/10/2025 | |
| 06/10/2025 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 6/10/2025 | |
| 07/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and sheet rock throughout. | |
| 07/22/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/09/2025 | COT - RSBU - Interior Shear Bracing | Passed | 10-9-25: approved. | |
| 10/30/2025 | COT - RSPL - Plumbing Final | Passed | 10/30/25 corrections made | |
| 10/30/2025 | RSBU - Building Final | Passed | 10/30/25 corrections made | |
| 10/30/2025 | COT - RSEL - Electrical Final | Passed | 10/30/25 corrections made | |
| 10/30/2025 | COT - RSEL - Outdoor Lighting | Passed | 10/30/25 corrections made | |
| 10/30/2025 | COT - RSME - Mechanical Final | Passed | 10/30/25 corrections made |