Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 07/15/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
7-15-25: firefoam all penetrations at top plates, DWV must be under test including shower or tub, install mud ring for UFER on the exterior and re-adjust acorn allowing for access, a 12" clearance is required between can lights and pex-either move pex away allowing for required clearance or block using osb, plywood, 2x4 or drywall. Add straps or clamps to secure all DWV. |
| 07/22/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Ok to insulate and sheet rock throughout. |