Permit: TC-MDP-0625-00323
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
5740 S NOGALES HY
Address NEW:
5740 S NOGALES HY
Apply Date:
06/06/2025
Applicant:
Jorge Navarro
Description:
Duplex (Model master plan TC-MDP-0724-00807)
Permit Reviews
Permit Number - TC-MDP-0625-00323
Permit Status: Inspections
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/05/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 09/19/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 | 11/20/2025 | APPROVED |
| 06/10/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 06/26/2025 | REQUIRES RESUBMIT |
| 01/22/2026 | SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 | 01/30/2026 | APPROVED |
| 08/07/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 08/07/2025 | REQUIRES RESUBMIT |
| 11/04/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 | 11/07/2025 | REQUIRES RESUBMIT |
| 12/05/2025 | ADMINISTRATIVE v.1 | 12/05/2025 | REQUIRES RESUBMIT |
| 11/20/2025 | RESTAMP - RESIDENTIAL v.1 | 12/05/2025 | APPROVED |
| 02/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/20/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0625-00323
Permit Status: Inspections
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
| Date | Description | Comments |
|---|---|---|
| 06/10/2025 | The plan submitted shows to be for a duplex BLDG 5 Units 9 & 10. The location 5740 S Nogales Hy does not have BLDG 5 attached to the address and a pre issuance addressing condition has been placed on permit. Please contact Pima County Addressing at addressing@pima.gov or 520-724-9512 to verify/add the BLDG number. An address change request is required to have the bldg and units added to this permit. In addition, if the BLDG and units end up different from the ones specified on your site plan and resubmittal may be required as well. | |
| 06/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/24/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0625-00323
Permite Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2026 | COT - RSBU - Preslab | N/A | Partial Pass | 02/27/2026 Partial pending preslab for Building 3 & 4. Building 5 (unit 9 & 10) okay for concrete placement, plumbing underground passed. |
| 03/18/2026 | RSBU - Building Progress | N/A | Partial Pass | 03/18/2026 Partial pass pending other units at same permit address. Verified final lift at Bldg 5 (unit 9 &10) and rebar reinforcement per plan, okay to proceed. |
| 04/03/2026 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | 4-3-26: per workers on site, units in question are not ready for intermediate inspection. |
| 04/21/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | 4-21-26: partial pass pending shower liner test. Okay to insulate and drywall-Please schedule a drywall screw inspection prior to tape & texture. |
| 05/27/2026 | COT - RSPL - Sewer | N/A | Partial Pass | 5/27/26: Pressure test and piping completed per approved plans. As-built drawings will be required to show the actual location of sewer runs as installed throughout the development. Approved to backfill with the contingency that as-built drawings are submitted prior to final inspection. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0625-00323
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 02/12/2026 Duplex Unit 9 & 10. Approved per site plan, foundation details. Okay for concrete placement. |
|
| 02/24/2026 | COT - RSPL - Rough Soil | Passed | 2-24-26: underground plumbing for unit 7 & 8 verified per plans & under test. Okay to backfill progress areas using shading materials. | |
| 03/31/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/03/2026 | COT - RSBU - Roof Nailing | Passed | 4-3-26: previously inspected & approved by O.Soares on 3/31/26. | |
| 05/27/2026 | COT - RSEL - Grounding/Bonding | Passed | 5-27-26: Building 5-grounding/bonding for unit's 11 & 12 approved. | |
| 06/02/2026 | COT - RSPL - Yard Water Line | Passed |