Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
5740 S NOGALES HY
Apply Date:
06/06/2025
Applicant:
Jorge Navarro
Description:
Duplex (Model master plan TC-MDP-0724-00807)

Permit Reviews

Permit Number - TC-MDP-0625-00323
Permit Status: Inspections
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Start Date Submittal Complete Date Status  
09/05/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 09/19/2025 REQUIRES RESUBMIT Review Details
11/14/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 11/20/2025 APPROVED Review Details
06/10/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 06/26/2025 REQUIRES RESUBMIT Review Details
01/22/2026 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 01/30/2026 APPROVED Review Details
08/07/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 08/07/2025 REQUIRES RESUBMIT Review Details
11/04/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 11/07/2025 REQUIRES RESUBMIT Review Details
12/05/2025 ADMINISTRATIVE v.1 12/05/2025 REQUIRES RESUBMIT Review Details
11/20/2025 RESTAMP - RESIDENTIAL v.1 12/05/2025 APPROVED Review Details
02/18/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/20/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0625-00323
Permit Status: Inspections
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Date Description Comments
06/10/2025 The plan submitted shows to be for a duplex BLDG 5 Units 9 & 10. The location 5740 S Nogales Hy does not have BLDG 5 attached to the address and a pre issuance addressing condition has been placed on permit. Please contact Pima County Addressing at addressing@pima.gov or 520-724-9512 to verify/add the BLDG number. An address change request is required to have the bldg and units added to this permit. In addition, if the BLDG and units end up different from the ones specified on your site plan and resubmittal may be required as well.
06/03/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/03/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/24/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0625-00323
Permite Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
08/31/2026 COT - RSEL - Electrical Underground N/A Not Applicable
09/25/2026 COT - BULD - SWG Clearance N/A Not Applicable 9/25/26: not applicable.
09/25/2026 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.
09/25/2026 COT - RSEL - Electrical Final N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.
09/25/2026 COT - RSEL - Outdoor Lighting N/A Re-inspection required 9/25/26: install bubble covers that are " heavy duty while in use."
09/25/2026 COT - RSME - Mechanical Final N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.
09/25/2026 COT - RSPL - Backwater Valve N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.
09/25/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable 9/25/26: not applicable.
09/25/2026 COT - RSPL - Plumbing Final N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.
09/25/2026 COT - RSPL - Sewer N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.
09/25/2026 ENGR Engineering Final N/A Not Ready
09/25/2026 RSBU - Building Final N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.
09/25/2026 RSBU - Building Progress N/A Re-inspection required 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access.
Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0625-00323
Permit Description: Duplex (Model master plan TC-MDP-0724-00807)
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/12/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 02/12/2026
Duplex Unit 9 & 10. Approved per site plan, foundation details. Okay for concrete placement.
02/24/2026 COT - RSPL - Rough Soil Passed 2-24-26: underground plumbing for unit 7 & 8 verified per plans & under test. Okay to backfill progress areas using shading materials.
03/31/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/03/2026 COT - RSBU - Roof Nailing Passed 4-3-26: previously inspected & approved by O.Soares on 3/31/26.
05/27/2026 COT - RSEL - Grounding/Bonding Passed 5-27-26: Building 5-grounding/bonding for unit's 11 & 12 approved.
06/02/2026 COT - RSPL - Yard Water Line Passed
08/31/2026 BULD - Electrical Clearance Passed Passed CLEARANCE ECO
09/25/2026 COT - RSBU - Preslab Passed 9/25/26: approved.
09/25/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/25/26: approved.

Documents

File Name Document Type  
TRUSS CALCULATION_V1.PDF DOCUMENTS VIEW
APPROVED - TD-DEV_0824-00228_ DEVELOPMENT PACKAGE_FINAL 4_V3 - STAMPED 11.03.2025_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
SITE DEVELOPMENT SHEET UNITS 9 - 10 REV_V1.PDF DOCUMENTS VIEW
11_13_SITE_PLAN_TC-MDP-0625-00323_BLDG 5 UNITS 9 - 10__V3_V4.PDF DOCUMENTS VIEW
CONS-11_13_MODEL_CONSTRUCTION DOCUMENTS BDLG 5__V2_V3.PDF DOCUMENTS VIEW