Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| RSBU - Building Final | Re-inspection required | 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access. Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added. |