Inspection History Details
Inspection Status: Partial Pass
Inspection History: RSBU - Building Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2026 | RSBU - Building Progress | Partial Pass | 2-19-26: partial pass for 1’ stem wall. Reinforcement at stem wall for unit’s 11 &12 verified per plans. Install a 4” sleeve for charlotte piping penetrating cmu wall at each unit. Provide a picture to me prior to grout | |
| 03/11/2026 | RSBU - Building Progress | Partial Pass | 03/11/2026 Partial pass pending next 4’ lift at Bldg 5 (Unit 9 & 10) at cmu wall. |
|
| 03/18/2026 | RSBU - Building Progress | Partial Pass | 03/18/2026 Partial pass pending other units at same permit address. Verified final lift at Bldg 5 (unit 9 &10) and rebar reinforcement per plan, okay to proceed. |
|
| RSBU - Building Progress | Re-inspection required | 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access. Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added. |