Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
4-20-26: seal penetrations at top plates throughout, seal any horizontal penetrations throughout, add a Boca plate behind tubs, add osb/plywood a shower liner test, fix tear at flex at bedroom 3 and at additional marked locations, ground metallic pancake box at exterior light fixture with a green screw,add plastic bushing at sub panel to protect feeder, add cripple stud at water heater platform, frame out/add a platform for HVAC units to sit on, anchor bolts are required within 6" at the ends of plate and spaced 32" o.c. ( see plans ) add a stud shoe to 2x6 at corner of laundry room ( non load bearing walls cannot be over notched more than 40%). Stopped inspection-additional items may be noted. |
| 04/21/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
4-21-26: partial pass pending shower liner test. Okay to insulate and drywall-Please schedule a drywall screw inspection prior to tape & texture. |