Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2026 | COT - RSPL - Sewer | Partial Pass | 5/27/26: Pressure test and piping completed per approved plans. As-built drawings will be required to show the actual location of sewer runs as installed throughout the development. Approved to backfill with the contingency that as-built drawings are submitted prior to final inspection. | |
| COT - RSPL - Sewer | Re-inspection required | 9/25/26: unit 10-a drywall screw inspection was not done, therefore, a magnet test is required, an anti tip device is required for stove, gas valve was not installed at stove as indicated on plans-submit a revision to the city showing change, arch fault breakers required for every habitable area, install a cvpvc pressure relief valve-cannot have a flex to cvpvc, laundry room receptacle must be gfci, insulate hose bib, missing back water valve, install a 90 degree elbow on condensation line on north side, EV Charger must contain car decal on receptacle, install bubble covers on exterior gfci receptacles, toilet in bedroom requires a 15" clearance from shower, submit as-built sewer plan as requested from G.Armenta-see notes for more information, provide ladder for roof access. Unit 9-anti tip device on stove, seal water closets, gfci receptacles required at laundry room. Stopped inspection-additional items may be added. |