Permit: TC-MDP-0525-00316
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
456 W WYOMING ST
Address NEW:
456 W WYOMING ST
Apply Date:
05/31/2025
Applicant:
Adalberto Diaz
Description:
LUMO III New SFR (Model master plan TC-MDP-0323-00824)
Permit Reviews
Permit Number - TC-MDP-0525-00316
Permit Status: Complete
Permit Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2025 | ADMINISTRATIVE v.1 | 10/21/2025 | REQUIRES RESUBMIT |
| 09/25/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 10/21/2025 | APPROVED |
| 10/24/2025 | ADMINISTRATIVE v.2 | 10/24/2025 | APPROVED |
| 12/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/29/2025 | APPROVED |
| 06/02/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 06/18/2025 | REQUIRES RESUBMIT |
| 12/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/15/2025 | REQUIRES RESUBMIT |
| 08/29/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 09/19/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0525-00316
Permit Status: Complete
Permit Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
| Date | Description | Comments |
|---|---|---|
| 05/30/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/30/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/12/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00316
Permite Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 12-12-25: add nails at exterior 6" o.c. Along edges/splices-north side of home above window add nails, add shot pins within 6" at the ends of each plate. |
| 12/24/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 12/24/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 12/12/2025 | COT - RSPL - Plumbing Final | N/A | Canceled | 12-12-25: canceled by contractor. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0525-00316
Permit Description: LUMO III New SFR (Model master plan TC-MDP-0323-00824)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2025 | COT - RSPL - Rough Soil | Passed | Passed 10/30/25 ok to backfill | |
| 10/30/2025 | COT - RSEL - Electrical Underground | Passed | Passed 10/30/25 ok to backfill | |
| 11/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-13-25: excavation/reinforcement, preslab verified per plans-okay for concrete placement. | |
| 11/13/2025 | COT - RSBU - Preslab | Passed | 11-13-25: excavation/reinforcement, preslab verified per plans-okay for concrete placement. | |
| 12/12/2025 | COT - RSBU - Roof Nailing | Passed | 12-12-25: okay to dry-in roof. | |
| 12/16/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/16/2025 All corrections made from prior 12/12/25 inspection. |
|
| 12/23/2025 | COT - RSPL - Yard Water Line | Passed | 12/23/2025 Under test and holding with blue tracer wire to meter in proper trench depth - okay to backfill with shading materials. |
|
| 12/24/2025 | COT - RSEL - Grounding/Bonding | Passed | 12/24/2025 Tie in to MSP. |
|
| 12/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/24/2025 Added fire foam to main bedroom at top plate. |
|
| 12/24/2025 | COT - RSPL - Sewer | Passed | 12/24/2025 Holding and under test to HCS with green tracer wire - okay to backfill with shading materials. |
|
| 01/05/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/14/2026 | BULD - Electrical Clearance | Passed | 01/14/2026 Clearance to TEP ECO. |
|
| 06/15/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/15/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/15/2026 | RSBU - Building Final | Passed | ||
| 06/15/2026 | RSBU - Building Progress | Passed | ||
| 06/15/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/15/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/18/2026 | ENGR Engineering Final | Passed |