Permit Details

Status:
Issued
Type:
Model Building Permit
Address NEW:
7627 S BEST MATE PL
Apply Date:
05/02/2025
Applicant:
Alonzo Martinez
Description:
Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433)

Permit Reviews

Permit Number - TC-MDP-0525-00284
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433)
Start Date Submittal Complete Date Status  
09/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/15/2025 REQUIRES RESUBMIT Review Details
05/07/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/19/2025 APPROVED Review Details
09/26/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/29/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0525-00284
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433)
Total Outstanding Activity Conditions - 2
Date Name
05/01/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/07/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0525-00284
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433)
Date Description Comments
05/19/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/19/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/07/2025 Post-Installed Anchor Inspection Report is required.
05/07/2025 Post-Tension Inspection Report is required.
05/01/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0525-00284
Permite Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/30/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 5-30-25, partial pass for UFER only.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0525-00284
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433)
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/21/2025 BULD - Electrical Clearance Passed 5-21-25, panel is okay to be energized. ECO clearance issued to TEP.
05/22/2025 COT - RSPL - Rough Soil Passed 5-22-25, underground plumbing verified & HCS connection verified per plans. Okay to backfill with shading materials.
05/22/2025 COT - RSPL - Sewer Passed 5-22-25, underground plumbing verified & HCS connection verified per plans. Okay to backfill with shading materials.
05/29/2025 COT - RSEL - Electrical Underground Passed
05/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5-30-25, excavation/reinforcement and setbacks per plans. Okay to pour concrete
05/30/2025 COT - RSBU - Preslab Passed 5-30-25, preslab,excavation/reinforcement and setbacks per plans. Okay to pour concrete
05/30/2025 RSBU - Building Progress Passed
06/13/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6-13-25: exterior clips/sheathing approved.
06/13/2025 COT - RSBU - Roof Nailing Passed 6-13-25: approved.
06/20/2025 COT - RSEL - Grounding/Bonding Passed
06/20/2025 COT - RSPL - Yard Water Line Passed
06/20/2025 COT - RSPL - Gas Pressure Test Passed
07/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 7/3/2025
07/11/2025 COT - RSBU - Interior Shear Bracing Passed 7-11-25: interior shear inspection approved. Okay to tape & texture drywall
08/28/2025 COT - BULD - SWG Clearance Passed 8.28.2025
Clearance for SW Gas.
09/11/2025 COT - RSEL - Electrical Final Passed 9.11.25
APPROVED
09/11/2025 COT - RSEL - Outdoor Lighting Passed 9.11.25
APPROVED
09/11/2025 COT - RSME - Mechanical Final Passed 9.11.25
APPROVED
09/11/2025 COT - RSPL - Plumbing Final Passed 9.11.25
APPROVED
09/11/2025 ENGR Engineering Final Passed Site is safe and complete in accordance with approved plans.
09/11/2025 RSBU - Building Final Passed 9.11.25
APPROVED

Documents

File Name Document Type  
BHK 100 SIC-2025-09-26_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 100 D1_V1.PDF DOCUMENTS VIEW
BHK 100 SIC-2025-05-02_V1.PDF DOCUMENTS VIEW