Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 06/20/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6/20/25: Nail plates required where mechanical/plumbing/electrical comes within 1 1/4" from face of 2x, insulation required at pex lines in non-conditioned attic, NM cable shall be secured 12" from box, 48" AFF for thermostat, revise set for copper clad conductors, fan box shall not be secured with drywall screws. |
| 06/24/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6/24/2025 per previous notes. Missing h25s in garage north side. Sheathing in hall bath at exhaust fan exposed. Electrical wires sitting on gusset plates. Add FHA plates to orange tubing in garage due to over notched top plates. |
| 06/26/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
6/26/2025 Electrical wires sitting on gusset plates. Add FHA plates to orange tubing in garage due to over notched top plates. Attic opening to appliance exceeding 20´. Add grommet to exhaust fan in attic. Exposed wires in disconnect attic area. |
| 07/03/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Corrections were made. 7/3/2025 |