Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00573
Permit Details
Apply Date:
05/01/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00573
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/19/2024 | APPROVED |
05/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00573
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00573
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Date | Description | Comments |
---|---|---|
05/13/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
05/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/01/2024 | Post-Tension Inspection Report is required. | |
05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/08/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
05/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00573
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 13
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2024 | COT - RSPL - Backwater Valve | N/A | Not Ready | |
07/22/2024 | COT - RSPL - Rough Soil | N/A | Not Ready | |
07/22/2024 | COT - RSPL - Sewer | N/A | Not Ready | |
07/22/2024 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
09/04/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Not ready. Working in home at intermediate stage. 9/4/2024 |
09/04/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Not ready. Working in home at intermediate stage. 9/4/2024 |
COT - RSEL - Electrical Final | N/A | Scheduled | ||
COT - RSEL - Outdoor Lighting | N/A | Scheduled | ||
COT - RSME - Mechanical Final | N/A | Scheduled | ||
COT - RSPL - Plumbing Final | N/A | Scheduled | ||
ENGR Engineering Final | N/A | Scheduled | ||
RSBU - Building Final | N/A | Scheduled | ||
RSBU - Building Progress | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00573
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/24/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 7/24/2024 | |
07/24/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 7/24/2024 | |
07/24/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 7/24/2024 | |
07/24/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/24/2024 | |
07/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/31/2024 | COT - RSBU - Preslab | Passed | ||
07/31/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/31/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
09/05/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Approved. 9/5/2024 | |
09/05/2024 | COT - RSBU - Roof Nailing | Passed | Approved. 9/5/2024 | |
09/23/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/11/2024 | COT - RSBU - Interior Shear Bracing | Passed | Corrections have been made 10/11/24 | |
11/21/2024 | COT - BULD - SWG Clearance | Passed | 11-21-24, approved for Southwest gas to install meter. |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0524-00573
Status: Issued
Description: Blackhawk H30D Model Plan
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/26/2024 | COT - RSPL - Plumbing Final | Scheduled | |
11/26/2024 | ENGR Engineering Final | Scheduled | |
11/26/2024 | COT - RSEL - Outdoor Lighting | Scheduled | |
11/26/2024 | RSBU - Building Final | Scheduled | |
11/26/2024 | COT - RSEL - Electrical Final | Scheduled | |
11/26/2024 | COT - RSME - Mechanical Final | Scheduled | |
11/26/2024 | RSBU - Building Progress | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.