Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/23/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Insulate water lines in ceiling at garage area. All Exhaust fans not wired. Provide support at 90 for gas line. Receptacle in first bedroom exceeding 12'. Add cs16 strap or FHA plate to top plate at solar tubing due to over notching. Pex lines not on test. Add nail plates to electrical lines that are less than an 1 1/4". 9/23/2024 |
| 09/24/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Add cs16 strap or FHA plate to top plate at solar tubing due to over notching. Flex duct in great room area incomplete. Fire foam electrical line in 2nd bedroom. Secure electrical line in master bath ceiling. 9/24/2024 |
|
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|