Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6116 E BLACK CAVIAR PL
Apply Date:
05/01/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan

Permit Reviews

Permit Number - TC-MDP-0524-00570
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Start Date Submittal Complete Date Status  
08/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/28/2025 REQUIRES RESUBMIT Review Details
05/02/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/13/2024 APPROVED Review Details
07/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/23/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00570
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 1
Date Name
07/23/2025 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-0524-00570
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Date Description Comments
05/13/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.
05/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00570
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/20/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 6/17/25: trades shall not begin work prior to completion of framing inspection.
6/20/25: Fasteners at all shear walls not per plan, fasteners shall not be closer than 3/8" from edge of panels and shall not over penetrate more than 1/8" at osb and shall sit flush with face of thermoply, anchor bolts shall be no closer than 4" from edge of sill plate and no further than 12'' from edge, RSP4 spacing not per plan at west wall line, shearwall missing per plan at south west corner of house, shearwall length not per plant at south east corner plans call for 7', detail 36/SD4 not per plan at non-bearing shearwall below, Gabel end bracing not per plan, SD4/35 at master not per plan, shim interior load bearing wall at h2.5, loose roof panels at south east and north east.
06/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 6/17/25: trades shall not begin work prior to completion of framing inspection.
6/20/25: Fasteners at all shear walls not per plan, fasteners shall not be closer than 3/8" from edge of panels and shall not over penetrate more than 1/8" at osb and shall sit flush with face of thermoply, anchor bolts shall be no closer than 4" from edge of sill plate and no further than 12'' from edge, RSP4 spacing not per plan at west wall line, shearwall missing per plan at south west corner of house, shearwall length not per plant at south east corner plans call for 7', detail 36/SD4 not per plan at non-bearing shearwall below, Gabel end bracing not per plan, SD4/35 at master not per plan, shim interior load bearing wall at h2.5, loose roof panels at south east and north east.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00570
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/22/2025 COT - RSPL - Rough Soil Passed 5-22-25: underground plumbing verified as per approved plans. Okay to backfill with shading materials.
05/22/2025 COT - RSPL - Sewer Passed 5-22-25: HCS verified per plans. Okay to backfill with shading materials.
05/22/2025 COT - RSPL - Yard Water Line Passed 5-22-25, main water line approved. Okay to backfill using shading materials.
06/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 6-4-25: preslab,excavation/reinforcement verified per plan. Okay to pour concrete.
06/04/2025 COT - RSBU - Preslab Passed 6-4-25: preslab,excavation/reinforcement verified per plan. Okay to pour concrete.
06/04/2025 COT - RSEL - Electrical Underground Passed 6-4-25: electrical underground approved.
06/20/2025 BULD - Electrical Clearance Passed 6-4-25: missing address label on panel. Have Electrical Engineer/Architect of record submit a revision letter to the city documenting he/she authorizes the use of copper clad wires.
6/20/25: ECO TEP CLEARANCE
06/26/2025 COT - RSBU - Roof Nailing Passed
06/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6/27/2025 approved.
07/09/2025 COT - RSPL - Gas Pressure Test Passed 7-9-25: approved
07/11/2025 COT - RSEL - Grounding/Bonding Passed 7-11-25: residential intermediate inspection approved. Okay to construction.
07/11/2025 RSBU - Building Progress Passed
07/24/2025 COT - RSBU - Interior Shear Bracing Passed 7.24.25
Fastener schedule at shear walls meets or exceed requirements. Ok to proceed.
07/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7.24.25
Intermediate verified and approved under "building progress, bonding" previously, see History for notes and ref.
09/05/2025 COT - BULD - SWG Clearance Passed 9.5.2025
Clearance for SW Gas.
10/23/2025 COT - RSEL - Electrical Final Passed
10/23/2025 COT - RSEL - Outdoor Lighting Passed
10/23/2025 COT - RSME - Mechanical Final Passed
10/23/2025 COT - RSPL - Plumbing Final Passed
10/23/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans. Engineering is okay for CofO.
10/23/2025 RSBU - Building Final Passed