Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 7-9-25: firefoam penetration at garage, near east window directly in front of island, & bedroom top plates, seal penetrations at t-ply in bedrooms and throughout house-some marked, walk house and seal accordingly,receptacle spacing in middle eastern bedroom at 13 1/2'-max spacing is 12'. Either add another receptacle or adjust to 12' max., missing acorn clamp at ufer. Also, per IRC N1102.4 (R402.4) all penetrations between conditioned and unconditioned spaces require sealing- seal penetrations at garage leading to a conditioned space. | |
| 07/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 7-9-25: firefoam penetration at garage, near east window directly in front of island, & bedroom top plates, seal penetrations at t-ply in bedrooms and throughout house-some marked, walk house and seal accordingly,receptacle spacing in middle eastern bedroom at 13 1/2'-max spacing is 12'. Either add another receptacle or adjust to 12' max., missing acorn clamp at ufer. | |
| 07/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7.24.25 Intermediate verified and approved under "building progress, bonding" previously, see History for notes and ref. |