Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof Nailing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 6/17/25: trades shall not begin work prior to completion of framing inspection. | |
| 06/20/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 6/17/25: trades shall not begin work prior to completion of framing inspection. 6/20/25: Fasteners at all shear walls not per plan, fasteners shall not be closer than 3/8" from edge of panels and shall not over penetrate more than 1/8" at osb and shall sit flush with face of thermoply, anchor bolts shall be no closer than 4" from edge of sill plate and no further than 12'' from edge, RSP4 spacing not per plan at west wall line, shearwall missing per plan at south west corner of house, shearwall length not per plant at south east corner plans call for 7', detail 36/SD4 not per plan at non-bearing shearwall below, Gabel end bracing not per plan, SD4/35 at master not per plan, shim interior load bearing wall at h2.5, loose roof panels at south east and north east. |
|
| 06/24/2025 | COT - RSBU - Roof Nailing | Re-inspection required | 6/24/2025 per previous notes. Trades in home continuing without approval. | |
| 06/26/2025 | COT - RSBU - Roof Nailing | Passed |