Inspection Status: Re-inspection required

Inspection History: COT - RSPL - Rough Soil 

Date Description Inspector Results Comments
05/20/2025 COT - RSPL - Rough Soil  Re-inspection required 5-20-25, not ready. Per P2604.1 of the IRC, trenches shall be free of debris, rocks, loose dirt. Rocky unstable soil shall be over-excavated by two or more pipe diameters and brought to the proper grade with suitable compacted granular material.
05/21/2025 COT - RSPL - Rough Soil  Re-inspection required 5-21-25, underground plumbing verified per plans. However, trench shall be free of debris, rocks, loose dirt, and all plumbing joints must be visible. Rocky unstable soil shall be over excavated by two pipe diameters and brought to grade with suitable compacted granular material. See P2604.1 of the IRC.
05/22/2025 COT - RSPL - Rough Soil  Passed 5-22-25: underground plumbing verified as per approved plans. Okay to backfill with shading materials.