Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2025 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
5-20-25, not ready. Per P2604.1 of the IRC, trenches shall be free of debris, rocks, loose dirt. Rocky unstable soil shall be over-excavated by two or more pipe diameters and brought to the proper grade with suitable compacted granular material. |
| 05/21/2025 |
COT - RSPL - Rough Soil |
|
Re-inspection required |
5-21-25, underground plumbing verified per plans. However, trench shall be free of debris, rocks, loose dirt, and all plumbing joints must be visible. Rocky unstable soil shall be over excavated by two pipe diameters and brought to grade with suitable compacted granular material. See P2604.1 of the IRC. |
| 05/22/2025 |
COT - RSPL - Rough Soil |
|
Passed |
5-22-25: underground plumbing verified as per approved plans. Okay to backfill with shading materials. |