Permit: TC-MDP-0524-00569
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6108 E BLACK CAVIAR PL
Address NEW:
6108 E BLACK CAVIAR PL
Apply Date:
05/01/2024
Applicant:
Alonzo Martinez
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00569
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/02/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/13/2024 | APPROVED |
| 07/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/23/2025 | REQUIRES RESUBMIT |
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/28/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00569
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/23/2025 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0524-00569
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Date | Description | Comments |
|---|---|---|
| 05/13/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 05/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/01/2024 | Post-Tension Inspection Report is required. | |
| 05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/08/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00569
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Canceled | 6/17/25: TRUSS LAYOUT NOT PER PLAN, Bracing at truss not per plan, roof sheathing was not checked due to truss layout being incorrect, shear wall truss connection not per plan throughout, interior non-load bearing wall truss connection not per plan, anchor bolts shall not be closer than 4" to edge of sill plate and shall not be further than 12" from edge of sill plate, MASA clips shall be no closer than 4" from edge of sill plate and shall be no further than 12" from edge of sill plate, sill plates larger than 12'' require 2 anchor bolts, fasteners at shear wall not spaced per plan and are over penetrating thermoply (throughout), anchor bolts spacing not per approved plans at interior load bearing walls at entry, gabel and bracing not per plan, shot pins required throughout. ALL TRADES SHALL NOT BE BEGINNING WORK PRIOR TO INSPECTION BEING CONDUCTED/ COMPLETE, PLEASE RECALL INSPECTION AFTER TRADES HAVE REMOVED ALL MATERIAL, 6/20/25: canceled per OMAR |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00569
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2025 | COT - RSPL - Backwater Valve | Passed | 5-22-25: backwater valve verified per plans. | |
| 05/22/2025 | COT - RSPL - Rough Soil | Passed | 5-22-25: underground plumbing verified as per approved plans. Okay to backfill with shading materials. | |
| 05/22/2025 | COT - RSPL - Sewer | Passed | 5-22-25: HCS verified per plans. Okay to backfill with shading materials. | |
| 05/22/2025 | COT - RSPL - Yard Water Line | Passed | 5-22-25, main water line approved. Okay to backfill using shading materials. | |
| 06/04/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6-4-25: excavation/reinforcement verified per plan. Okay to pour concrete. | |
| 06/04/2025 | COT - RSBU - Preslab | Passed | 6-4-25: preslab approved. Okay to pour concrete. | |
| 06/04/2025 | COT - RSEL - Electrical Underground | Passed | 6-4-25: electrical underground approved. | |
| 06/20/2025 | BULD - Electrical Clearance | Passed | 6-4-25: missing address label on panel. Have Electrical Engineer/Architect of record submit a revision letter to the city documenting he/she authorizes the use of copper clad wires. 6/20/25: ECO TEP CLEARANCE |
|
| 06/23/2025 | COT - RSBU - Roof Nailing | Passed | 6/23/2025. Approved. Corrections were made. | |
| 06/27/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6/27/2025 approved per new truss layout per engineered fix. All other items have been completed. Cat walk is still incomplete but due to the distance to the appliance it's going to be ready by intermediate. | |
| 07/09/2025 | COT - RSEL - Grounding/Bonding | Passed | 7-9-25: approved | |
| 07/11/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7-11-25: intermediates approved. Okay to continue with construction | |
| 07/11/2025 | COT - RSPL - Gas Pressure Test | Passed | 7-11-25: approved. | |
| 07/24/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7.24.25 No interior shear gyp. Checked general fastener schedule and confirmed railroading not to be present. Ok to proceed. |
|
| 09/05/2025 | COT - BULD - SWG Clearance | Passed | 9.5.2025 Clearance for SW Gas. |
|
| 10/20/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/20/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 10/20/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. Engineering is good for CofO. | |
| 10/20/2025 | RSBU - Building Progress | Passed | ||
| 10/21/2025 | COT - RSEL - Electrical Final | Passed | 10/21/25 corrections made | |
| 10/21/2025 | COT - RSME - Mechanical Final | Passed | 10/21/25 corrections made | |
| 10/21/2025 | RSBU - Building Final | Passed | 10/21/25 corrections made |